Time Shifting: Delay and Advance
## Time Shifting: Delay and Advance
Time Shifting: Delay and Advance
Time Shifting: Delay and Advance
Delay (Right Shift)
\(y[n] = x[n - k], \quad k > 0\)
The signal moves right by $k$ samples. The output at time $n$ depends on the input at earlier time $n-k$.
1
2
3
4
5
6
7
x[n]: [•] [•] [•] [•] [•] (indices: -1, 0, 1, 2, 3)
↑ ↑
n=0 n=2
x[n-2]: [•] [•] [•] [•] [•] (shifted right by 2)
↑ ↑
n=2 n=4
Advance (Left Shift)
\(y[n] = x[n + k], \quad k > 0\)
The signal moves left by $k$ samples. The output at time $n$ depends on the input at future time $n+k$.
Causality note: $x[n+k]$ requires future input values. Non-causal systems (not realizable in real-time). Causal systems only use $x[n-k]$ for $k \ge 0$.
This post is licensed under CC BY 4.0 by the author.